Chemical Products Factory

Project Overview

‎ ‎ ‎ ‎ ‎
Client
Salinas Calombolo

‎
Project
Chemical Products Factory

‎
Local
Benguela – Angola

‎
Execution Period
18 months

‎
Site Area
5000m2

Project Progress

1st quarter

Beginning of the foundations, ensuring the structural stability necessary for subsequent phases
as well as the initial structure of the annex buildings.

View Photos

2nd quarter

Prefabrication of the pipe racks in the factory is taking place in parallel with the civil construction work on site.
The structures will be transported to Angola with the pre-assembly completed, which will allow for faster, simpler and more efficient local assembly.

View Photos

3rd quarter

Assembly of some of the equipment and piping in the “cellroom”.
Placement of some of the tanks in the central area of ​​the industrial building, as well as in the storage area, and beginning of the assembly of the respective connecting pipes.

View Photos

4th quarter

Hydraulic and electrical interconnection of the various equipment in the industrial building, ensuring the integration of process circuits and utility networks necessary for the unit’s operation.

Installation and assembly of the main support systems for the factory — including water desalination and demineralization, ventilation and air conditioning, fuel purification, and power generation systems — essential for the continuous operation of the production lines.

View Photos

Menu

Home

About Novanor

Ongoing Work

Projects – Portfólio

News

Contacts

© Novanor 2023, Desenvolvido por Setup Tech, Todos os direitos reservados

default
default
default
default
default

default
default
default
default
default